Symthic Forum was shut down on January 11th, 2019. You're viewing an archive of this page from 2019-01-08 at 22:59. Thank you all for your support! Please get in touch via the Curse help desk if you need any support using this archive.

Welcome to symthic forums! We would love if you'd register!
You don't have to be expert in bit baking, everyone is more than welcome to join our community.

You are not logged in.

yugas42

Moderator

(1,387)

Posts: 1,494

Date of registration
: Sep 1st 2012

Platform: PC

Location: Pittsburgh, Pennsylvania

Battlelog:

Reputation modifier: 14

  • Send private message

11

Wednesday, February 1st 2017, 8:17pm

You people hurt my blood pressure. I'm glad this actually became productive, carry on.

Labby

Moderator

(6,444)

Posts: 1,941

Date of registration
: Sep 26th 2012

Platform: PC

Location: State of Confusion

Battlelog:

Reputation modifier: 15

  • Send private message

12

Wednesday, February 1st 2017, 9:30pm

You people hurt my blood pressure. I'm glad this actually became productive, carry on.

The solution was in my first post, just invisible.
[Aetherblade Medium Boots]

JOIN THE TEAMSPEAK (L)EVOLUTION: teamsym.nitrado.net


Mofixil

Sometimes I just get blinded by hate. And tears.

(377)

Posts: 1,414

Date of registration
: Jul 27th 2013

Platform: PC

Reputation modifier: 9

  • Send private message

13

Wednesday, February 1st 2017, 9:51pm

Codex is a proper faggot. The rest of you are notfags.


I'm not sure whether to feel insulted or not.

At any rate, love your content duckeh, keep it up.

Posts: 270

Date of registration
: Jun 5th 2015

Platform: Xbox One

Location: Hoth

Battlelog:

Reputation modifier: 8

  • Send private message

14

Wednesday, February 1st 2017, 10:30pm

carry on.

But the thread is pretty much finished?

Guess I can't disobey a mod tho. I'll try and contribute.

MD, you can use this image (royalty-free) to illustrate how triangles work. Though, I expect, naturally, a shower of rep as well, and we can share future yt channel revenue 60/40, k?

signature 2.3



Omit Needless Words


Things I support
ammo regen pls

Quoted from "NoctyrneSAGA"

_____

When I play with it [Autoloading 8] I feel like I am batman taking out 1 after 1 baddie while they feel helpless and don't know who is talking out their mates.
Remove 3D spotting. It’s a mechanic that rewards bad eyesight.
Wanna help your team by sneaking through enemy territory to provide spawns? THIS IS NOT TEAMWORK FGT I HOPE YOU RUN OUT OF MOTION BALLS TOO EARLY TO BE SUCCESSFUL
Wanna be Javelin squad but only have two guys? BETTER NOT GET YOUR SOFLAM KILLED FGT THIS IS NOT TEAMWORK WITHOUT A SUPPORT DUDE DROPPING AMMO ON YOU EVERY 2 MINUTES
Please post your best M1916 clips Magazines *fixed*.


DICE pls

Squadmate Healthbars in the HUD
Minor console QoL improvements
Ping Tool idea
"Wants to talk" tag for squad menu
Adding Suppression Confirmation
Spotting suggestions
Squad priority vehicle system (and anti stealing suggestion)

Posts I should finish sometime:
Scoring system flaws (and concept)
Battlefield definition
Flow, immersion and fun in battlefield
Specializations: ideas and system rework
Gadget reworks and ideas
Vehicle gamplay
Why limited infinite ammo would be awesome
Other bitesize ideas


This post has been edited 1 times, last edit by "potetr" (Feb 1st 2017, 10:38pm)


ViperFTW

Suidae cathexis

(2,737)

Posts: 9,736

Date of registration
: Jul 1st 2012

Platform: PC

Location: Newcastle upon Tyne, United Kingdom

Battlelog:

Reputation modifier: 20

  • Send private message

15

Wednesday, February 1st 2017, 11:51pm

The rest of you are notfags.


Yep, I'll definitely take that :thumbsup:

Everybody's Favourite Worthless Support and LMG Fan! :thumbsup:



Song currently stuck in my head is: Red Cold River by Breaking Benjamin!

Posts: 294

Date of registration
: Jun 9th 2012

Platform: PC

Battlelog:

Reputation modifier: 10

  • Send private message

16

Thursday, February 2nd 2017, 12:05am

I think Mofixil's 2nd set of values is correct.

marbleduck

Smoked Salmon Best Salmon

(1,514)

  • "marbleduck" started this thread

Posts: 1,026

Date of registration
: Dec 25th 2012

Platform: PC

Location: Yakima. WA

Battlelog:

Reputation modifier: 13

  • Send private message

17

Thursday, February 2nd 2017, 1:43am

By the virtue of post-ironic memes, "notfag" is an insult.

Platoon Marble Duck

Hate Mail

"you obviously don't know what an argument is as there is only one person battling. Do you really fucking think I want subs? You think you can act all big and powerful just because you sit on a computer at least 6 hours a day like the probably nerdy unwanted retard you are with 4.3k subs? You think 4.3k subs is a lot? LOL you need medicine man. I don't want any subs as i just have a google account for other media and writing comments. Think twice before you act. You even said in your video you aren't that great of a player, and the comments agree you aren't. Maybe you should once again think twice before you act, stop being such an annoying, ignorant bastard that everyone wants to shut up, and god, literally, just shut up. Your voice gave me a headache :s"

"As a youtuber shouldn't be trying to be reeling in your viewers with exciting stuff being said not your boring ass commentary for your video"

"The more you watch his vid the dumber he gets I swear he's borderline autistic look I got shot behind cover beacuase thin sheets metal are unpenetrable. Bf4 is just as quiet and tactical as bf3 random explosion in the background . Player has dissconected from chat
You started playing bf3 and never touched bfc1/2. Please do yourself a favor and shutdown your generic cod channel down"

"Nice clickb8 Faggot w8ting for your shit tier video to disable comments . Fucking newfag cancer go play some cod you activisiom cock faggot"

"I don't see why he [MarbleDuck] always tries to shit on levelcap he is better and has a million more subs...and also "there isnt a best gun in she game there are guns that are better that others at different engagement distances" yes thats true and whichever is the best/most average at all of them is the "best gun""

"Marbleduck you don't know shit lol levelcap knows more than you do you cant talk about how someone puts up garbage when you do yourself your a newcomer to YouTube acting like you know shit step up in the food chain first then you have the right to talk otherwise your just a fish trying to compete with sharks"

"Why don't we just witness "LevelCap vs MarbleDuck" One on One both on Battlefield 3 and Battlefield 4 seen as there is so much Controversy about the Two Youtubers"

"stfu cunt, BF3 was way better end of discussion"

"Stfu man, you're be littleing the most looked upon Battlefield Youtuber. No one cares about you, how much of an ego you have, or quite frankly your opinion. It's a fucking game.... Does it really fucking matter? Pathetic man."

"fuck you asshole, dont talk shit about total"

"Wtf is your problem? You have no subs and he has millions, yet you pick on him like some kind of stubborn, ignorant, rude child born with a silver spoon is his mouth. It's easy to do that, for example... You said there was no background noise yet there is. You say you're a fairly good player, you're not."

"please talk like a normal person and not like a professional"

Zer0Cod3x

Can't get a title

(1,327)

Posts: 1,531

Date of registration
: Dec 23rd 2013

Platform: Xbox One

Location: The Land of Multitudinous Kangaroos

Reputation modifier: 13

  • Send private message

18

Thursday, February 2nd 2017, 3:18am

ITT: everyone is a faggot
something something Model 8 bestgun


How to ice an A-91

Next, wanna try adding a guy that you KNOW is bad, and just testing to see that? Example: PP-2000 (god I so wanna love this gun, and yet...)

Example: PP-2000 (god I so wanna love this gun, and yet...)

PP-2000 added. Y'know, it's not that bad....

Yes, it comes in last so far, but that is mostly because I'm making it shoot at 100m ADS - Not Moving as one of the criteria. Even then, between 50-100m Not Moving, when you include Useability, it is only 1.37% worse than the MTAR-21. Within 50m then it even beats the A-91.

Have a look, vs. the A-91 Carbine:




Using it with Muzzle Brake and Compensator is a wash in terms of overall performance. Comp is SLIGHTLY more accurate, while MB is SLIGHTLY more easy to use. Their overall scores are basically tied, with MB just ahead. I guess either can be recommended.

But... You can't be counting for the fact that it takes 9 bullets to kill at "long" range... Don't you dare tell me my A-91 is worse than a 9 BTK 650 RPM mediocre PDW.

Also. Just go heavy barrel. The recoil is low enough.

Well, technically...

Comparing a PP2K with HB and an A-91 with comp and stubby (as you suggested in an earlier post), at 50m not moving, the A-91 is only better by 4 damage per hitrate. While at 75m and 100m, surprisingly the PP2K does better than the A-91 (I'm pretty damn surprised as well).

And 10m and 50m moving the PP2K also does more damage per hitrate than the A-91. At 25m the A-91 is only better by about half a bullet's damage as well.

In addition, the PP2K has a much larger mag size and substantially less recoil. And it looks hella awesome. So comparing the A-91 to a PDW is of some worth after all, as the PP2K is better (technically, not practically) than the A-91.

Mind blown.

I... I...

*cries in a corner*

Zer0Cod3x explained it very well. If you look at the raw numbers right here on Symthic Comparison, you can see how that happened:

A-91 vs PP-2000 | BF4 Weapon Comparison | Symthic

A-91's "23%" RPM advantage only afforded it 1 extra round.

Reload times are wash.

Velocities are wash.

V-Recoil are wash (and this is HBar on PP2k vs. A-91 without).

Hipfire and ADS - Moving are better on the PP2k, but it's a PDW and not the surprising part.

The surprising part is that, as equipped (and we see above that PP2k HBar has almost same V-Recoil as A-91 without HBar so why not?), the PDW performs better at 50 - 100m than a bloody Carbine. Why?

H-Recoil Spread, 0.525 vs. 0.45, advantage PP2k.

SIPS, 42% better on the PP2k.

And here is the most important part. ADS - Not Moving Spread, 0.35 vs. 0.2, 43% improvement.

Without HBar then of course the PP2k loses, which is why when I add all the attachments together for an Overall Ranking, it would slot below the A-91. Run HBar on it, though, then... I'm sorry

@Veritable
@Zer0Cod3x
I... I...
But...
Wha...
I AM HAVING AN EXISTENTIAL CRISIS IN SCHOOL BECAUSE OF YOU TWO.

FUCK YOU NERDS AND YOUR FANCY NUMBERS

SEXY RUSSIAN BULLPUPS FTW.

In all seriousness, thank you both so much for giving me the numbers. I still don't want to accept them. You have led the horse to water. I still need to drink.


Posts: 129

Date of registration
: Oct 8th 2016

Platform: PC

Battlelog:

Reputation modifier: 2

  • Send private message

19

Monday, February 13th 2017, 3:38am

Unless my math is completely off.

"Wide" is a diameter. For the radius, you divide by two.


@marbleduck

M1916 Marksman head: 47.7 m
M1916 Marksman body: 119.4 m

Model 8.35 Marksman head: 40.9 m
Model 8.35 Marksman body: 102.3 m

0.18 SLR head: 31.8 m
0.18 SLR body: 79.6 m

0.21 SLR head: 27.3 m
0.21 SLR body: 68.2 m

If you want non-100% hitrates, you can find the capsule-spread circle intercepts yourself.


Now I expect you to shower me in REP and a mention in your video for doing your crappy calculations for you.
I can't understand how you got this answer, which I hate because I so rarely get a chance to do math stuff.

After stumbling through trying to remember stuff I hadn't used in forever, I realized you're probably multiplying 10cm by the cotangent of the spread value. But shouldn't it be half the spread value? You're treating 10 cm as the opposite side of a right triangle, so shouldn't you be treating the spread value as being bisected by the right angle?

Zer0Cod3x

Can't get a title

(1,327)

Posts: 1,531

Date of registration
: Dec 23rd 2013

Platform: Xbox One

Location: The Land of Multitudinous Kangaroos

Reputation modifier: 13

  • Send private message

20

Monday, February 13th 2017, 4:08am

After stumbling through trying to remember stuff I hadn't used in forever, I realized you're probably multiplying 10cm by the cotangent of the spread value. But shouldn't it be half the spread value? You're treating 10 cm as the opposite side of a right triangle, so shouldn't you be treating the spread value as being bisected by the right angle?

No, because spread is a radius.

"0.2 degrees of spread" refers to the angle between the edge of the spread cone and the line from the apex of the cone to the centre of the base. The whole angle is 0.4 degrees.
something something Model 8 bestgun


How to ice an A-91

Next, wanna try adding a guy that you KNOW is bad, and just testing to see that? Example: PP-2000 (god I so wanna love this gun, and yet...)

Example: PP-2000 (god I so wanna love this gun, and yet...)

PP-2000 added. Y'know, it's not that bad....

Yes, it comes in last so far, but that is mostly because I'm making it shoot at 100m ADS - Not Moving as one of the criteria. Even then, between 50-100m Not Moving, when you include Useability, it is only 1.37% worse than the MTAR-21. Within 50m then it even beats the A-91.

Have a look, vs. the A-91 Carbine:




Using it with Muzzle Brake and Compensator is a wash in terms of overall performance. Comp is SLIGHTLY more accurate, while MB is SLIGHTLY more easy to use. Their overall scores are basically tied, with MB just ahead. I guess either can be recommended.

But... You can't be counting for the fact that it takes 9 bullets to kill at "long" range... Don't you dare tell me my A-91 is worse than a 9 BTK 650 RPM mediocre PDW.

Also. Just go heavy barrel. The recoil is low enough.

Well, technically...

Comparing a PP2K with HB and an A-91 with comp and stubby (as you suggested in an earlier post), at 50m not moving, the A-91 is only better by 4 damage per hitrate. While at 75m and 100m, surprisingly the PP2K does better than the A-91 (I'm pretty damn surprised as well).

And 10m and 50m moving the PP2K also does more damage per hitrate than the A-91. At 25m the A-91 is only better by about half a bullet's damage as well.

In addition, the PP2K has a much larger mag size and substantially less recoil. And it looks hella awesome. So comparing the A-91 to a PDW is of some worth after all, as the PP2K is better (technically, not practically) than the A-91.

Mind blown.

I... I...

*cries in a corner*

Zer0Cod3x explained it very well. If you look at the raw numbers right here on Symthic Comparison, you can see how that happened:

A-91 vs PP-2000 | BF4 Weapon Comparison | Symthic

A-91's "23%" RPM advantage only afforded it 1 extra round.

Reload times are wash.

Velocities are wash.

V-Recoil are wash (and this is HBar on PP2k vs. A-91 without).

Hipfire and ADS - Moving are better on the PP2k, but it's a PDW and not the surprising part.

The surprising part is that, as equipped (and we see above that PP2k HBar has almost same V-Recoil as A-91 without HBar so why not?), the PDW performs better at 50 - 100m than a bloody Carbine. Why?

H-Recoil Spread, 0.525 vs. 0.45, advantage PP2k.

SIPS, 42% better on the PP2k.

And here is the most important part. ADS - Not Moving Spread, 0.35 vs. 0.2, 43% improvement.

Without HBar then of course the PP2k loses, which is why when I add all the attachments together for an Overall Ranking, it would slot below the A-91. Run HBar on it, though, then... I'm sorry

@Veritable
@Zer0Cod3x
I... I...
But...
Wha...
I AM HAVING AN EXISTENTIAL CRISIS IN SCHOOL BECAUSE OF YOU TWO.

FUCK YOU NERDS AND YOUR FANCY NUMBERS

SEXY RUSSIAN BULLPUPS FTW.

In all seriousness, thank you both so much for giving me the numbers. I still don't want to accept them. You have led the horse to water. I still need to drink.